绿化工程定额规定调整说明
绿化工程定额规定调整说明
Regulation on the quota of Greening Engineering
1、苗木预算价格包括:圃存价、挖掘费、泥球包扎费、吊装费、运输费、运输损耗、卸车费、种植损耗、采保费、植物检疫费、苗木经营利润等。
1, the budgetary price of the seedlings includes: Nursery price, excavation fee, mud ball binding fee, hoisting fee, transportation fee, transportation loss, unloading fee, planting wastage, insurance premium, plant quarantine fee, and management profit of the seedlings.
2、种植费包括:苗木、草坪的种植及种植后的垃圾及废弃物的清运。大树种植还包括吊装机械费。
2, planting expenses include: seedling, lawn planting and garbage removal after planting. The planting of big trees also includes hoisting machinery.
3、成活率期是指绿化工程竣工验收后起连续十二个月。成活率期养护费包括:草绳绕树干费、常规支撑费、遮荫棚费、软式通气管费、人工费、水电费等。
3, survival rate refers to the completion of green projects after acceptance for twelve consecutive months. The maintenance rate of survival rate includes: straw rope around tree trunk, conventional support cost, shading shed fee, soft ventilation pipe fee, labor cost, water and electricity charges and so on.
4、管理费包括:
4. The management fee includes:
(1)工程所在地范围内的建筑垃圾及框格护坡模具 箱体护坡模具 华尔街铜牛 电阻柜 接地电阻柜 电缆保护接地箱 隔离墩模具 化粪池模具其它障碍的清理和外运工作。费用由甲乙双方在合同中说明。
(1) the construction and disposal of construction waste and other obstacles within the location of the project. The cost is explained by the Party A and B in the contract.
(2)工程所在地范围内原有苗木的起挖或砍伐挖根;起挖草皮或清除草皮工作。费用由甲乙双方在合同中说明。
(2) digging or cutting down the original seedlings in the area where the project is located; digging up the grass or clearing the turf. The cost is explained by the Party A and B in the contract.
(3)原有苗木起挖后的土球包扎或打浆、修剪、出塘、装车搬运工作。费用按实结算。
(3) the soil ball that has been excavated after the seedling has been bandaged or beaten, pruned, digged and loaded. The cost is settled in real terms.